(5) 4 Single GC vmk crowns & 2-unit bridge(6) Anterior 5-unit GC porcelain implant bridge on 2 straumann implants (7) Full uppper tinted acrylic denture & full lower tinted acrylic denture on CAD/CAM dolder bar (4 straumann implants) (8)5-Unit temp with metal strengthener (9) 6-Unit GC porcelain bridge and a 3-unit GC porcelain implant bridge on 2 southern implants (10) 11 single GC press crowns (11) 9-Unit GC porcelain bridge on 3 bone-level straumann implants and (12) 11-unit GC porcelain bridge on 6 southern implants.
Anterior view of 4 GC vmk single crowns & 2-unit GC vmk bridge
Occlusal view of 4 GC single vmk crowns & 2-unit GC vmk bridge
Finished anterior 5-unit implant bridge on 2 straumann implants Dr. G. Bellingan Work done by: Eikestad Dental
Impression used to manufacture the dolder bar on. Dr. D. Botha Work done by: Eikestad Dental
Titanium dolder bar on 4 straumann implants manufactured by using CAD/CAM(CEREC) technology. Dr. D. Botha Work done by: Eikestad Dental
1st Try-in- Upper & lower dentures in the wax stage. Dr. D. Botha Work done by: Eikestad Dental
Buccal view of cured(finished) upper tinted denture & lower tinted denture on titanium dolder bar (4 straumann implants). Dr. D. Botha Work done by: Eikestad Dental
View of titanium dolder bar on 4 straumann implants in patient's mouth. Dr. D. Botha Work done by: Eikestad Dental
Buccal view of finished upper & lower acrylic dentures in patient's mouth. Dr. D. Botha Work done by: Eikestad Dental
5-Unit temp bridge waxed up & counters taken + metal strengthener waxed up & cast in cerlaloy alloy-beryllium free. Dr. G. Bellingan Work done by: Eikestad Dental
Finished 5-unit temp bridge with metal strengthener, glazed, polished & ready for delivery. The bridge is manufactured using Enamel temp plus material. Dr. G. Bellingan Work done by: Eikestad Dental
Patient's left view of 5-unit temp bridge with metal strengthener. Dr. G. Bellingan Work done by: Eikestad Dental